2025 Energy Code HERS is now ECC — same required tests, new name. We speak both.
HERS ECC Title 24 Group Contractors
HERS ECC Title 24 Group

QII Inspections

Quality Insulation Installation — two scheduled inspections: at framing (air sealing details, baffles, draft stops) and at insulation (full coverage; no gaps, voids, or compression; grade documented).

Claiming QII in the energy model and failing it in the field blows the compliance margin late in the build. We walk the model’s assumptions with your insulation sub before the first inspection, so the schedule never eats a surprise.

Schedule QII inspections