HERS ECC Title 24 Group
QII Inspections
Quality Insulation Installation — two scheduled inspections: at framing (air sealing details, baffles, draft stops) and at insulation (full coverage; no gaps, voids, or compression; grade documented).
Claiming QII in the energy model and failing it in the field blows the compliance margin late in the build. We walk the model’s assumptions with your insulation sub before the first inspection, so the schedule never eats a surprise.