CF3R-MCH-20-H ↗Duct leakage diagnostic test
Measures leakage from the duct system using calibrated test equipment for applicable new and existing systems.
Schedule a testComplete services & measure catalog
Our ECC/HERS services follow the measures identified on the approved 2025 Title 24, Part 6 compliance documents. The exact verification required depends on occupancy, project scope, compliance approach, equipment, and the registered project documents.
Mechanical & HVAC
Diagnostic and visual measures for ducts, airflow, fans, refrigerant, equipment, filters, and specialized HVAC systems.
CF3R-MCH-20-H ↗Measures leakage from the duct system using calibrated test equipment for applicable new and existing systems.
CF3R-MCH-21-H ↗Verifies applicable duct location requirements or compliance credit conditions.
CF3R-MCH-22-H ↗Measures electrical power used by the air-handler fan in relation to delivered airflow.
CF3R-MCH-23-H ↗Measures airflow through the space-conditioning system using an approved diagnostic procedure.
CF3R-MCH-24-H ↗Applicable mechanical documentation connected to building or dwelling-unit enclosure air-leakage testing.
CF3R-MCH-25-H ↗Verifies refrigerant charge using the applicable procedure and operating conditions for eligible cooling equipment.
CF3R-MCH-26-H ↗Confirms installed space-conditioning equipment matches the rated equipment and approved compliance documents.
CF3R-MCH-28-H ↗Verifies return-duct design and air-filter device sizing under the applicable Part 6 tables.
CF3R-MCH-29-H ↗Verifies conditions used for applicable duct-area reduction, insulation, or buried-duct compliance credit.
CF3R-MCH-30-H ↗Verifies applicable Central Fan Ventilation Cooling System components and performance.
CF3R-MCH-31-H ↗Measures whole-house fan airflow and fan efficacy where this measure is required.
CF3R-MCH-33-H ↗Verifies eligible variable-capacity heat-pump equipment and applicable compliance-credit conditions.
Ventilation & exhaust
Verification of whole-building ventilation and local exhaust systems, including kitchen range hoods.
CF3R-MCH-27-H ↗Verifies required whole-building ventilation equipment, controls, and delivered airflow.
CF3R-MCH-32-H ↗Measures or verifies local mechanical exhaust airflow and applicable sound/label information for kitchen range hoods.
CF3R-MCH-32-H ↗Verifies applicable local mechanical exhaust fans serving bathrooms and other required spaces.
Airflow diagnostic ↗Uses approved airflow-measurement methods and confirms the installed system is accessible and operational.
Envelope & insulation
Field verification for air leakage, insulation quality, and existing conditions at the required construction stage.
CF3R-ENV-20-H ↗Measures air leakage through building or dwelling-unit enclosures with calibrated blower-door equipment.
CF3R-ENV-21-H ↗Verifies air-infiltration sealing before insulation and assemblies conceal required inspection areas.
CF3R-ENV-22-H ↗Verifies insulation is installed without significant gaps, voids, compression, or misalignment.
CF3R-EXC-20-H ↗Verifies applicable existing building features used for an alteration compliance approach.
Water heating
CF3R-PLB-22-H ↗Verifies eligible single-dwelling-unit hot-water distribution measures where specified by the compliance documents.
Documentation & project support
Project review, applicable verification-document workflow, and coordination with the responsible parties.
Review of legacy records and available documents to determine the next registry and compliance steps.
Review of available permit and compliance information to identify field-verification work within our scope.
Repeat scheduling, organized intake, field coordination, and consistent status communication for contractor partners.
Scheduling for QII, air sealing, ducts, and other measures that must be observed before construction covers the work.
Focused retesting of measures after the responsible installer completes corrections.
The registered compliance documents—not a generic website list—determine which verification forms and procedures apply to a particular project.
Measure names and form identifiers are based on the California Energy Commission’s 2025 Single-Family compliance-document library.
Send the project documents
Include the address, permit number, scope, CF1R documents, installer information, and project stage.
Request an inspection