2025 Energy Code HERS is now ECC — same required tests, new name. We speak both.
HERS ECC Title 24 Group Contractors
HERS ECC Title 24 Group

Duct Leakage Testing

We pressure-test the duct system with a calibrated fan, measure leakage against the requirement for the project’s scope and code cycle, and file the CF2R/CF3R documentation in CHEERS. Rough-in or final; changeouts, new systems, and full new construction.

Pass-first-time prep checklist

Failed tests get a written, photo-supported punch list on site — your crew fixes it while the equipment is still on the truck, and we retest without drama.

Schedule duct testing